Concrete Calculators

Last updated .

These pages answer how much concrete or cement a shape needs. The concrete, slab, and footing calculators start at 2,400 kg/m³. That is a planning default for the weight of the pour, about 2.02 short tons and 4045.33 lb per cubic yard. It is not a mix design.

A slab usually needs more answers after the volume: bags if you are mixing them, the steel in the slab, and the stone under it. Premix bag counts are on this hub. Rebar, mesh sheets, and other steel shapes are the steel hub. A gravel base is the gravel hub. Asphalt is listed here because it is the other paved surface on the site, not because it is a concrete mix.

A column is a round or square pier, including a sonotube diameter. A post hole subtracts the post. Steps are solid blocks from grade plus a full-height landing. A driveway is the 4, 5, or 6 inch thickness guide, with a truck count that is a planning assumption.

Which calculator do I need?

Job Open
Volume and weight of a pour Concrete
Bags of premixed concrete Concrete bags
A flat slab Concrete slab
A driveway, with a truck count Concrete driveway
A footing or pier Concrete footing
A round or square column, or a sonotube Concrete column
Concrete in a post hole, post subtracted Concrete post hole
Steps, with a full-height landing Concrete steps
Bags of cement Cement
Cement, sand, and aggregate proportions Cement, sand, and aggregate
Only the sand in a concrete mix Concrete sand
An asphalt surface instead of concrete Asphalt
A bagged self-leveling compound, on the flooring hub Self-leveling
The bar inside the slab or footing Rebar, on the steel hub

Guides

  • Bags vs ready-mix

    How to compare bag yield with a plant quote, including labor, mixing, and the short-load question to ask.

  • Concrete mix ratios

    IS 456 Table 9 for M10, M15, and M20, and how the 1:2:4 calculator uses the 1.54 factor.

All guides